HIDES PRODUCTION HOURLY 2ND SHIFT 11AM-730PM
Description
Flesher -11am to finish (typically 7:30pm) – dependent on volume and production and/or maintenance delays
Job requirements
- Lift and place Hides from rail on Flesher machine, monitor equipment and adjust as needed
- Trimming of Hides as required
- Monitor hides on table to insure smooth operation through equipment
- Maintain / Clean up work area throughout the day
- Required to rotate among other flesher positions to prevent fatigue
EOE/Vets/Disability